Pages

Tuesday, May 20, 2014

Do Not Stray!

Am I bouncing back and forth? ok ok... Let's stick to the backyard. Remember that picnic table that I sanded down? Well, consider it done. I stained the table top and seats a Red Mahogany and spray painted the legs a Navy Blue, per wife's instruction.

{blue moon}

{corona}

This is a picture of the picnic table after a light shower. We liked how the Red Mahogany showed up a little darker, so I applied another coat of stain, let it dry and sprayed a light Rust-o-leum Lacquer on it.

{accidentally in love}

And since the showers have subsided for a bit, I pulled the Big Green Egg table out and set it where it needed to be. But with this Texas heat I'm going to need a cover for the grill table too, so the BGE doesn't fade and the table doesn't get too weathered. Great idea huh? Yup, another project :)

{trough needs ice}
Ready to Grill!?!?!

Monday, May 19, 2014

So Much for Man Cave!

Will I ever get a Man Cave? Maybe the Gameroom upstairs? Maybe not!

Just joking.  I never thought of having a Man Cave in this house of ours. If anything it'd be a separate barn house on a remote piece of land, decked out with all the amenities. Some day....

As for this house, we have pictures below showing the progress on the upstairs game room. The last update you saw were of the finished bathrooms and then of all the doors being spray-painted in the non-carpeted whole upstairs. Well before the carpet was installed we also painted the walls, Benjamin Moore Grey Owl, and made some modifications to the bookshelf. We removed the cabinets doors of the top level and created more open shelving. All of the bottom doors and drawers had new nickel hardware installed.  We also replaced the recessed light with an LED bulb for brighter lighting. As you can see in the below picture, even with the blinds fully open, it still didn't brighten up the area as much. The gloomy rainy day didn't help either.  

{Worms}
Also hung on the wall is a magnetic board for our son to play on. Yes, 9 months and he knows the alphabet - not really. You can also see the edge of the Pottery Barn train table sitting right there.

{soup}
Moving further into the room, we have the mounted TV and entertainment center. See what I mean about lost Man Cave? Yeah the room is cluttered with toys. I won't show you what toys are on the other side of the room.  

Due to the studs behind the wall and the TV mount that Sarah bought, the TV is slightly off-centered. Joking again! We went with the non-traditional off-centered approach and are planning on flooding the walls on the side and top of the TV with picture frames. Luckily the opposite wall is big enough for us to move the sectional sofa to be centered with the TV. Those pictures are to come once we decide on the artwork for the wall above the sofa.

{game on!}
The remaining work on this room is at the top of Sarah's List, hopefully. On to the next one for me!

Thursday, May 8, 2014

Joining the Cult


Yup! I'm doing it.. I'm joining the Big Green Egg Cult! What did you think I was talking about?

Bought this beauty over the Easter weekend:

{initiation}
We've actually been able to use it already to make some jalapeno onion burgers and even smoked some ribs this past weekend.  I would say they both turned out very delicious, especially for a first time go at it. 

As you can see, we did the inaugural grilling with the BGE sitting on some pavers. So, naturally, the next project would be....? You got it! A table to set this grill/smoker in! And so my job was to build a table that can handle the weight of this 100+ lbs BGE (MEDIUM!!!) and still have enough room to hold all the necessary accessories. I was able to find set of plans on NakedWhiz.com and made a couple of modifications for it to span the length of our chimney enclosure outside.

{backbone}
{first coat}
{planking}

I used the 12x24 tiles that we had left over from the upstairs bathroom reno and used them as a plate setter on the top shelf and a heat barrier for the lower shelf. Four caster wheels were installed into the legs with the two on the BGE side having brakes on them. 

With all the boards screwed in and 3 coats of BEHR Redwood Semi-transparent Weatherproofing stain applied, it was time to see how my math modifications held up.

{A+}
I would say that the table turned out nicely. Sarah would say that it looks a little orange!  Well, it's just an unintentional slip to support my Longhorns! I mean intentional slip!  

Remaining items that still need to be added to this table: a bottle opener with catcher for the chef hard at work, hooks for the different utensils, maybe a dowel rod installation for towels.  And maybe I'll install a pull-out tray beneath the lower shelf to store some of the BGE accessories, still to be decided upon.

Looks great yeah? Thanks, then will you come help me lift the BGE into this stand??


Wednesday, May 7, 2014

♪ ♫ Summer, Summer, Summer.. Tiiiiime ♫ ♪

Anyone recognize that song? Are we showing our age? and your age? Yes, old school Will Smith! And that's the theme of today's post. 

It's been about 4 months now since we've last posted and the reason being?.?.?... this guy:

{easter bunny}

Naturally, we have been devoting a lot of time to this handsome devil. Not to say that we haven't had projects around the house, but we've prioritized time spent.  

So, the last post was about the upstairs bathrooms.  We were glad to get them done in time to host Christmas for about 17 people.  They still need some TLC, caulking clean-up, window sill paint, and of course, decors of more vibrant colors to offset the white and grey bathroom base colors.  We've added some furniture to the master bedroom as well as some window treatment - some things to make if feel like an adult bedroom.  The mauve-ish walls were repainted to a 25% lighter Grey Owl.  The brown carpet remains until we decide to update the wood floors for the downstairs floor. It's coming along!

Now back to the theme.  In Texas, summer comes a little early, to where Spring was just a  passing two weeks at best.  And so, what we've moved up to the top of our priorities list, are the front and back yards. And for us to work on either one, we would need a place to rest during our sweaty breaks.  Hence comes this project:


{picnic}

{beer me}

This will be perfect place for our summer yardwork breaks.  I'm working on sanding all the previous grey stain down and re-staining it a red mahogany color.  And since this will also be our entertaining table (off of Craigslist for $25), I've decided to cut out the middle plank to put in some drink troughs.  The planters have holes drilled into them with stoppers to prevent a wet floor while guests are at the table.  The troughs will be recessed underneath so the planks will still lay atop for table space.  I'm hoping to get this done before Mother's Day weekend.  Can this pass as my Mother's Day gift? Of course not! Give me more credit than that!

But it'll help.....

Hope your Summer is off to a good start!  What do you have planned?

Thursday, January 2, 2014

Flushed

So... we hosted Christmas this year and you know what that means. Sarah made that the deadline for upstairs bathroom renovations. Here's a partial reveal of the results. We've essentially gutted both bathrooms, new floor tiles, new subway tiles for the shower, refinished and painted bathtub, new white marble vanities, replaced hardware and fixtures, and fresh coats of paint.  Our previous toilets were very weak in the flush department, so we picked up two new Kohler toilets from HD.

 {vain}

{Moen}

Hopefully we can gather more pictures of the upstairs, and more of the bathrooms.  I would say that we are very pleased of the facelift.  Our next step is to fill the rooms with decor and, of course, family memories.

How did I do?

Happy Reno!


Tuesday, October 15, 2013

On Your Mark...

Hi there!  Just found two minutes, so I thought I'd drop in and show some pictures of us getting ready.

 
 {control center}

We are getting carpet installed in the next two weeks, so we ripped out the carpet of the entire upstairs and made the game room our main control center, i.e. equipment and tool storage. And since were are planning on repainting all the walls upstairs, we used the game room as the painting center. All of the doors were removed and lined along the wall and sprayed. Thank goodness for the Wagner sprayer and hungry family members.

 {trust}

There's a lot of trust hanging out there for me to let someone else do the painting. But for the sake of getting it done, and also Simply White being on top of a previous white paint making imperfections less noticeable, I loosened the reigns a smidgen.

Sarah and I have been touching up other things upstairs like the closets, bookshelfs, and built-in desk. We've also gotten the bathrooms prepped for tiling. So, be on the look out for my 2-minute-drop-in picture updates.

Happy Remodeling.


Wednesday, September 18, 2013

Good Night Construction Site

Back to that subject of priorities again!  We spend so much of our time downstairs with the little one, we forget that we set our priority to be upstairs remodeling. We would find little things downstairs to work on, and they would be little knick-knaks. You've already seen that I started with the Laundry room and the half bathroom. We are very pleased with them of course, but again delays upstairs progress. Then there are things that we'd like to make more pleasing to our eyes like changing some of the AC vents to bright white and changing door knob handles to satin nickel handles.  
Another frustrating item is changing out door hinges to nickel hinges. The previous owner, maybe even the builder, decided to fill in the hinge screws with wood filler before painting them. So the process of digging out the screws then unhinging took a bit of time.
The time spent on these items were all well spent, just out of order. So re-prioritizing puts us at DEMOLITION of the J&J bathroom and the Guest bathroom. These pictures are results of bribing family with dinners for their labor.

{naked shower}
The cultured marble took a little muscle to rip off, but we're glad we did it. This shower obviously hasn't been inspected, in probably the 20 years of the previous owners' occupancy.  There was some mold on the backer boards from water leakage, so we will be replacing all of that also.

{not so vain anymore}
We demo-ed the vanities in both bathrooms. The were built-in, so we had to take hammers to it rather than a simple pull out.

{firewood}
Our temporary storage for all of the demolition were the rooms themselves. The carpet being pretty close to the top of the list to be ripped out was a plus for us to not worry about throwing all this trash atop.

{bagster}
And this is where it all ended up.  Home Depot sells these bags ($30) that you can set on your driveway for trash collection. The bag was 3 cubic yards (2 ft by 4 ft by 8 ft) and we were able to fit both showers, both vanities, and tile and mortar from both floors. You just have to go to www.thebagster.com and schedule a pick-up date. They'll come with a dumpster truck equipped with a hydraulic arm to pick it up into the truck, as simple as that.  
It didn't look like we had room in the bag for the mirrors and the shower backerboards and so we didn't take them down.  Or that may be our excuse for now.  They may end up as part of our weekly trash pick-ups.
Thanks to my family for helping out with the demolition.  Now on to the remodel part!

What have you demolished lately?
Any thoughts on what we could have done better?